Design approval for roadways works and public realm projects (Abu Dhabi)

To obtain approval on detailed design drawings for utilities service corridors in coordination with the relevant authorities

access_time Time to Complete To Be Confirmed
tag_img Service Fee: No Fees

Process Description

1- Provide the necessary documentation to the customer service employee or through available channels
2- In case of completion of the requirements, receipt of documents and establishment of a service transaction
3- Selecting the mechanism for receipt of outputs
4 - Receiving outputs according to the time required for each service
5- Response to the happiness questionnaire (optional)

Abu Dhabi City Municipality Headquarter
Al Bateen Center
Mushrif Mall Center 
Abu Dhabi Marina Mall Center 
Abu Dhabi Chamber Center 
Al Shahama Center 
Al Mussafah Center
Al Wathba Center
Bawabat Al Sharq Mall Center
Muroor Food Distribution Centre
Mussafah Food Distribution Centre

"• A textbook from the project owner or asset owner
• Copy of the project planning approval (Route approval and service segments)
• Letter of approval issued by the competent authority in the technical and engineering aspects of the project
• Sealed and approved engineering plans by the competent authority
• Outline of the area showing the trajectory/location of infrastructure elements on a modern aerial imaging map
• Blueprints and detailed engineering studies to be approved for infrastructure components
• Project Area Elevation Report and exploratory drilling imagery to illustrate service lines Based on the path required to ensure that there is no conflict according to spatial data management standards
• Cadastral schemes illustrating contour lines and the topographic nature of the line route or lines by spatial data management standards
• Proposed solutions to existing service lines and infrastructure at the project site, depending on the requirements of service providers, infrastructure lines and design plans for these solutions. 
• Additional engineering documents are required to obtain the funds according to the nature and type of the project.  "

 
Consultant